Weather is one of construction's greatest challenges. Rain, snow, extreme temperatures, and humidity can delay schedules, damage materials, and compromise structural integrity. Proper weatherproofing protects your investment, maintains quality standards, and keeps projects on schedule regardless of conditions.
Understanding Weather Threats
Water Damage
- Direct rain: Saturates materials, damages finishes, creates mold conditions
- Ground moisture: Rises through capillary action, weakens foundations
- Condensation: Forms when warm air meets cold surfaces
- Ice dams: Cause water backup and infiltration
- Flooding: Site drainage failures during heavy rain
Temperature Extremes
- Freezing: Cracks concrete, bursts pipes, damages materials
- Heat: Accelerates concrete curing, warps materials, worker heat stress
- Thermal cycling: Expansion/contraction causes cracking
- Frost heave: Ground movement damages foundations
Wind and Sun
- Wind-driven rain: Penetrates walls horizontally
- Structural loads: High winds stress unfinished framing
- UV degradation: Breaks down materials left exposed
- Rapid drying: Causes concrete cracking, paint failure
Foundation Weatherproofing
Below-Grade Protection
- Waterproof membranes: Rubberized asphalt or polymer sheets
- Drainage boards: Channel water away from foundation
- French drains: Perimeter drainage systems with gravel
- Sump pumps: Remove accumulated water from basements
- Vapor barriers: Prevent moisture migration through concrete
Application Best Practices
- Apply membranes from bottom up, overlapping seams
- Seal all penetrations (pipes, conduits)
- Protect membranes during backfill operations
- Slope grade away from foundation (6" in 10 feet)
- Install gutters and downspouts properly
Wall Assembly Weatherproofing
Water-Resistive Barriers (WRB)
- House wrap: Tyvek, Typar - breathable, water-resistant
- Building paper: Traditional felt, asphalt-saturated
- Liquid-applied: Spray or roll-on membranes
- Rigid barriers: Foam sheathing with taped seams
Proper Installation Sequence
- Install WRB over sheathing before windows/doors
- Overlap horizontal seams 6", vertical seams 6"
- Tape all seams with compatible tape
- Flash window rough openings before installation
- Integrate flashings with WRB (shingle fashion)
- Seal all penetrations (lights, vents, outlets)
Critical Details
- Window head flashing: Slope away, extend past jambs
- Sill pans: Pre-formed or site-built, must dam ends
- Jamb flashings: Overlap sill pan, under head flashing
- Kick-out flashings: Divert water from wall to roof edge
- Step flashings: At roof-wall intersections
Roofing Weatherproofing
Underlayment Systems
- Asphalt felt: #15 or #30 weight, traditional choice
- Synthetic underlayment: Stronger, more durable, slip-resistant
- Self-adhering membranes: Ice and water shield for vulnerable areas
- High-temp underlayment: For metal roofing applications
Vulnerable Areas Requiring Extra Protection
- Eaves (first 3 feet minimum with ice shield)
- Valleys (full-length ice shield)
- Roof-wall intersections
- Penetrations (vents, chimneys, skylights)
- Low-slope areas (under 4:12 pitch)
Proper Ventilation
- Balanced intake (soffit) and exhaust (ridge) venting
- Minimum 1:150 ventilation ratio (1 sq ft per 150 sq ft attic)
- Prevents ice dams and moisture accumulation
- Baffles maintain airflow at eaves
- Never block ventilation with insulation
Temporary Weather Protection
During Construction
- Tarps and shrink wrap: Cover materials and open areas
- Temporary roofing: Felt or synthetic to dry-in quickly
- Plastic sheeting: Protect interior from weather
- Dehumidifiers: Control moisture in enclosed spaces
- Heaters: Maintain temperature for concrete curing, paint
Material Storage
- Store materials off ground on pallets or blocking
- Cover with waterproof tarps, weight securely
- Keep drywall, lumber, insulation completely dry
- Don't stack tarps directly on materials (trap moisture)
- Ventilate covered areas to prevent condensation
Seasonal Considerations
Winter Construction Strategies
- Heated enclosures: Temporary structures with heat for interior work
- Concrete additives: Accelerators and antifreeze admixtures
- Insulated blankets: Maintain concrete temperature during curing
- Ground thawing: Heat ground before excavation/concrete
- Snow removal: Keep work areas and materials clear
- Cold-weather materials: Low-temp caulks, adhesives, coatings
Hot Weather Precautions
- Concrete cooling: Use ice or cold water in mix
- Rapid curing control: Mist concrete, use curing compounds
- Shade materials: Prevent UV damage and overheating
- Early/late scheduling: Work during cooler hours
- Hydration stations: Worker safety in heat
Rainy Season Planning
- Monitor weather forecasts closely
- Schedule critical pours during dry spells
- Have tarps and pumps ready
- Improve site drainage before rainy season
- Store extra materials on-site (delivery delays)
- Plan alternative indoor tasks for rain days
Advanced Weatherproofing Systems
Rainscreen Systems
- Air gap behind siding for drainage and drying
- Pressure-equalized design prevents water intrusion
- Vertical furring strips or proprietary systems
- Ideal for high-exposure locations
- Required for many fiber cement installations
Vapor Barriers vs. Vapor Retarders
- Barriers: Near-impermeable (polyethylene sheeting)
- Retarders: Slow vapor transmission (kraft paper, paint)
- Climate-specific: Location determines which side needs protection
- Cold climates: Vapor barrier on warm (interior) side
- Hot-humid climates: May need exterior vapor retarder
- Mixed climates: Use "smart" membranes that adapt
Inspection and Testing
Quality Control Checkpoints
- Visual inspection of all flashings before covering
- Water testing of windows and penetrations
- Blower door testing for air leakage
- Infrared scanning for thermal bridges
- Moisture meter readings in framing
- Regular site walks during rain events
Common Defects to Watch For
- Reversed flashing laps (water flows wrong direction)
- Missing or damaged WRB
- Unsealed penetrations
- Inadequate drainage slopes
- Trapped moisture in wall assemblies
- Improperly installed vapor barriers
Documentation and Warranty Protection
Photo Documentation
- Photograph all hidden work before covering
- Document flashing installations in detail
- Record dates and weather conditions
- Capture drainage system installations
- Create as-built records of waterproofing
Manufacturer Requirements
- Follow installation instructions exactly
- Use compatible materials from same system
- Maintain proper storage and handling
- Install within temperature ranges specified
- Register warranties promptly
- Keep all receipts and certifications
Conclusion
Effective weatherproofing isn't optional. It's essential for building durability and owner satisfaction. While it adds upfront costs and requires careful attention to detail, the investment prevents far more expensive repairs, callbacks, and litigation down the road.
The key is understanding that weatherproofing is a system, not just individual components. Each layer must work together, and every detail matters. From foundation to roof, proper materials, correct installation sequences, and thorough quality control ensure your projects stand up to whatever weather brings.
Share your weatherproofing experiences. Connect with other contractors on Vest Social to discuss techniques and solutions.
Tags
Share this article
Ready to Join the Vest Social Community?
Connect with contractors, find jobs, and grow your construction career.